Accomplished:




- Insulation
- Drywall
- Taping/Sanding of Drywall
- Texture on walls
- Tiling of shower and floor in the Master Bathroom
- Tiling of shower and floor in the Extra Bathroom
- 5 interior doors hung (today)
- Trim around 5 interior doors (today)
- Framing of master bathroom cabinet (today)
- Framing of nearly all kitchen cabinets (today)
- Purchase of new front door
- Refinished laundry room cabinets
- Repurposed old kitchen cabinets to garage storage
In Progress:
- Ordered new storm windows (way more efficient)
- Ordered carpet
- Picked out wood floors and remaining tile
- Picked out all appliances
- Picked out extra bathroom vanity
- Purchase new attic ladder (finally able to access the storage space in the attic)
On the List:
- Pick out cabinet face design
- Pick out granite for cabinets
- Finish install of cabinets
- Finish floor install
- Paint walls
So now for the pictures:
Master Bathroom with framed cabinet and new tile
Newly framed kitchen cabinets
Extra Bathroom with tile in shower and floor