Wednesday, February 4, 2009

Who knew doors would be so much fun!

Ok, so it has been merely three weeks since we had our new contractor start, and here is a quick recap followed by the latest pictures:

Accomplished:
  • Insulation
  • Drywall
  • Taping/Sanding of Drywall
  • Texture on walls
  • Tiling of shower and floor in the Master Bathroom
  • Tiling of shower and floor in the Extra Bathroom
  • 5 interior doors hung (today)
  • Trim around 5 interior doors (today)
  • Framing of master bathroom cabinet (today)
  • Framing of nearly all kitchen cabinets (today)
  • Purchase of new front door
  • Refinished laundry room cabinets
  • Repurposed old kitchen cabinets to garage storage
In Progress:
  • Ordered new storm windows (way more efficient)
  • Ordered carpet
  • Picked out wood floors and remaining tile
  • Picked out all appliances
  • Picked out extra bathroom vanity
  • Purchase new attic ladder (finally able to access the storage space in the attic)
On the List:
  • Pick out cabinet face design
  • Pick out granite for cabinets
  • Finish install of cabinets
  • Finish floor install
  • Paint walls
So now for the pictures:
Master Bathroom with framed cabinet and new tile


Newly framed kitchen cabinets
Extra Bathroom with tile in shower and floor